Infrastructure projects: Is that road in your district running late?
See what roads, bridges, ponds, drains and public buildings cost, how far they have got and where they are late, from national highways to village drains.
All India: Union Budget figures, not by district
Cost, progress and delays
From national highways to village drains: the money the Centre set aside for each kind of work this year, and how much of it it now expects to spend.
Project records
All districts with records
Money in these records, by kind of work
About this district
What CAG audits found in public works
Key findings from the auditor's reports on highways, rural roads, bridges, sewage plants, ponds and government buildings.
Source: the 7 audit cards below, each citing a CAG report. These figures were entered by hand and have not yet been checked against the reports.
Performance Audit on Implementation of Bharatmala Pariyojana Phase-I & Dwarka Expressway
- Dwarka Expressway Cost Explosion (Para 3.4.1): The Cabinet Committee on Economic Affairs (CCEA) approved Bharatmala civil works at an average sanctioned rate of ₹18.20 Cr per km. However, NHAI sanctioned the Haryana section of Dwarka Expressway at an exorbitant ₹250.77 Cr per km without CCEA appraisal or sanction, generating a single-project escalation of over ₹5,200 Cr.
- Irregular Toll Concessions (Para 4.2.8): Concessionaires were allowed early commercial operation dates (COD) without completing toll plazas and weighing bridges, leading to unrecovered toll revenues of ₹132.80 Cr.
- Faulty Detailed Project Reports (DPRs): DPRs across 8 corridors failed to identify utility shifts and underground gas lines, resulting in ₹3,200 Cr paid to contractors as idle machinery compensation and claims.
Source cited: CAG Report No. 19 of 2023. This card is not yet linked to the report itself, and its figures have not yet been checked against it.
Performance Audit of Pradhan Mantri Gram Sadak Yojana (PMGSY-I, II & III)
- Substandard Bituminous Pavement (Para 5.1.2): Independent core sampling conducted by CAG in 12 states revealed that 64% of road stretches failed to meet the mandatory 20mm Premix Carpet (PMC) or 30mm Bituminous Concrete (BC) thickness standards. Contractors reduced bitumen content by 18-25%, leading to premature potholes within two monsoons.
- Fictitious Habitation Connectivity (Para 3.2.4): On the OMMAS portal, 1,420 habitations were recorded as 'Fully Connected', but field verification revealed unconnected habitations due to omitted cross-drainage bridges and unconstructed culverts.
- Evasion of 5-Year Maintenance (Para 6.3.1): Contractors routinely abandoned post-construction 5-year maintenance obligations. Despite non-performance, state implementing agencies failed to forfeit ₹1,120 Cr in performance security deposits.
Source cited: CAG Report No. 11 of 2024. This card is not yet linked to the report itself, and its figures have not yet been checked against it.
Special Audit on Construction of Major River Bridges and Rail Over Bridges (ROBs)
- Severe Synchronization Delays (Para 4.1.7): 42 ROB projects remained incomplete for over 5 years because State PWDs constructed approach ramps while Railways delayed General Arrangement Drawings (GAD) approvals for the railway portion, leaving ₹1,850 Cr in capital idle.
- Omission of Mandatory Pile Load Tests (Para 2.5.3): In 18 river bridge contracts, supervising engineers certified structural milestone payments before contractors performed mandatory sonic integrity and dynamic pile load testing.
- Substandard Scour Protection: River pier protection aprons were either constructed using undersized boulders or omitted entirely, rendering foundations vulnerable to flash flood scouring.
Source cited: CAG Report No. 8 of 2023. This card is not yet linked to the report itself, and its figures have not yet been checked against it.
Audit on Sewage Treatment Infrastructure & Pollution Abatement in Urban Water Bodies
- Severe STP Under-Capacity Utilization (Para 3.1.2): Out of 58 newly constructed STPs with ₹3,400 Cr capital outgo, 39 operated at less than 35% capacity due to missing branch sewer network connections, resulting in untreated municipal effluent pouring into rivers.
- Premature Security Deposit Releases (Para 4.4.1): Implementing boards refunded contractor retention funds of ₹420 Cr before completing biological stabilization and BOD/COD water discharge trials.
- Unsynchronized Pumping Stations: Sewage pumping stations (SPS) built without dedicated dual power feeders suffered daily overflows during municipal load shedding.
Source cited: CAG Report No. 23 of 2023. This card is not yet linked to the report itself, and its figures have not yet been checked against it.
Audit on Conservation of Water Bodies and Mission Amrit Sarovar Execution
- Fictitious Silt Excavation Measurements (Para 2.3.8): Earthmoving contractors were disbursed ₹420 Cr based on manual estimation without prerequisite pre- and post-work digital total station survey logs.
- Lack of Perimeter Fencing and Re-Encroachment (Para 4.1.1): Over 210 restored village ponds lacked permanent concrete boundary pillars, allowing local land grabbers to re-encroach catchment areas within 18 months of public rejuvenation.
Source cited: CAG Report No. 15 of 2024. This card is not yet linked to the report itself, and its figures have not yet been checked against it.
Compliance Audit on Construction of Administrative Complexes, Courts, and Secretariat Buildings
- Unwarranted Architectural Revisions Post-Tender (Para 3.2.1): Departments initiated comprehensive structural alterations after contract awards, elevating non-scheduled item (NSI) payouts by 40-110% over contract sums.
- Unrecovered Liquidated Damages (Para 5.6.3): CPWD and state engineers failed to levy or recover liquidated damages (LD) from delayed civil contractors, causing unrecovered loss of ₹380 Cr.
Source cited: CAG Report No. 7 of 2024. This card is not yet linked to the report itself, and its figures have not yet been checked against it.
Audit on Multi-State Freight Arterials & Industrial Corridor Connectivity
- Border Alignment Discrepancies: Failure between adjacent states to coordinate road level and corridor widths resulted in finished arterial roads ending abruptly at state borders, leaving ₹1,300 Cr in capital investments unutilized for up to 4 years.
Source cited: CAG Report on Industrial Corridors (2024). This card is not yet linked to the report itself, and its figures have not yet been checked against it.