Char Dham Highway: Cost, Status and Completion Date
Char Dham National Highway , is an under construction two-lane (in each direction) 889 km long National Highway with a minimum width of 10 metres in the Indian state of Uttarakhand under Char Dham Pariyojana . The under construction highway will complement the under-construction Char Dham Railway by connecting the four holy places in Uttarakhand states namely Badrinath , Kedarnath , Gangotri and Yamunotri . The project includes 889 km national highways which will connect the whole of Uttarakhand state. It will connect Delhi–Dehradun Expressway on its southern end to India-China Border Roads on its northern ends. The total cost of ₹ 12,000 crores and the foundation stone of the project was laid by Prime Minister Narendra Modi on 27 December 2016 at Parade Ground in Dehradun . The highway will be called Char Dham Mahamarg (Char Dham Highway) and the highway construction project will be cal
Key facts
| Item | Detail |
|---|---|
| Status | - |
| Built by | 889 km (552 mi) |
| Length | - |
| Completion | - |
| Location | Uttarakhand |
| Cost | The total cost of ₹ 12,000 crores and the foundation stone of the project was laid by Prime Minister Narendra Modi on 27 December 2016 at Parade Ground in Dehradun . |
Cost and funding
- The total cost of ₹ 12,000 crores and the foundation stone of the project was laid by Prime Minister Narendra Modi on 27 December 2016 at Parade Ground in Dehradun .
Source: Wikipedia article on the project. Wikipedia is written by volunteers and cites official and news sources; check the linked page and the executing agency for the latest figures.
Other major projects
- Mumbai–Ahmedabad high-speed rail corridor
- Western Dedicated Freight Corridor
- Eastern Dedicated Freight Corridor
- Jammu–Baramulla line
- Chenab Rail Bridge
- Delhi–Meerut Regional Rapid Transit System
- Bengaluru Suburban Railway
- Delhi–Mumbai Expressway
- Mumbai–Nagpur Expressway
- Ganga Expressway
- Bharatmala
- Zoji-la Tunnel