Delhi–Mumbai Expressway: Cost, Status and Completion Date

The Delhi–Mumbai Expressway (also known as NE 4 ) is an under construction (partially operational), 1,350-kilometre-long (840 mi) , eight- lane -wide (expandable to 12-lane), access-controlled , greenfield expressway connecting India's national capital New Delhi to its financial capital Mumbai , which cuts down the 24 hours Delhi-Mumbai travel time to 12 hours. Delhi–Mumbai Expressway connects the Sohna Elevated Corridor , Gurugram to the Jawaharlal Nehru Port in Navi Mumbai via Dausa , Kota , Ratlam , Vadodara and Surat . It passes through the Union territory of Delhi (12 km) and the states of Haryana (129 km), Rajasthan (373 km), Madhya Pradesh (244 km), Gujarat (426 km) and Maharashtra (171 km). The main length of the expressway from Sohna to Virar is 1,198 km , it's two extensions on either ends, DND–Faridabad–KMP (59 km) and Virar– JNPT (92 km), increase its length to 1,350 km. It a

Key facts

ItemDetail
Status-
Built by1,350 km (840 mi)
Length-
Completion12 February 2023 ( Sohna – Dausa ); 2 October 2023 (Dausa-Sawai Madhopur) (Bhanpura Interchange-Thandla Interchange) ; February 2024 (Vadodara-Bharuch); 18 December 2024 ( Kota -Laban) ; 11 January 2026 ( Bharuch -Kharel) ; 13 April 2026 (Vadodara-Godhra)–present
LocationDelhi , Haryana , Rajasthan , Madhya Pradesh , Gujarat and Maharashtra
CostThe total project value, including the land acquisition cost, is around ₹ 1,00,000 crores (~US$13.1 billion).

Cost and funding