Jammu–Baramulla line: Cost, Status and Completion Date
The Jammu–Baramulla line (including the Udhampur–Srinagar–Baramula Rail Link (USBRL) subsection) is a 324 km long railway between the cities of Jammu and Baramulla in Jammu and Kashmir India. It is fully operational as of 7 June 2025. Connecting the Kashmir Valley with the rest of India, this rail link has major geostrategic importance for the Indian armed forces . It has reduced the travel time between Jammu and Srinagar from 7 hours to 3 hours; it also connects the important religious pilgrimage sites of Mata Vaishno Devi Temple and Amarnath Temple . Completed in several phases, this link entails several engineering achievements including the Chenab Bridge - world's highest railway bridge, the Anji Khad Bridge - India's first cable-stayed railway bridge, the Pir Panjal Railway Tunnel (Banihal railway tunnel) - India's longest railway tunnel as of 2025, and the T33 tunnel , which, while
Key facts
| Item | Detail |
|---|---|
| Status | - |
| Built by | Indian Railways |
| Length | 324 km |
| Completion | 6 June 2025 |
| Location | Jammu and Kashmir |
| Cost | The total project cost in 2022 was INR28,000 crore (~US$3.5 billion). |
Cost and funding
- The total project cost in 2022 was INR28,000 crore (~US$3.5 billion).
- Ircon International , a public-sector company , was responsible for the construction of 175-kilometre (109 mi) Dharam-Qazigund-Baramulla section and Hindustan Construction Company built the 11,215 m (6.969 mi) Pir Panjal tunnel on this section at the cost of ₹ 900 crore .