JanWatchdog (जन निगरानी)

See where public money goes, from the Centre to your district

Polavaram Project: Cost, Status and Completion Date

The Polavaram Project is an under-construction multi-purpose irrigation project on the Godavari River in the Eluru District and Polavaram District in Andhra Pradesh , India . The project has been accorded National Project status by the Central Government of India . Its reservoir back water spreads up to the Dummugudem Anicut , i.e. approx 150 kilometres (93 mi) back from Polavaram dam on main river side and approx 115 kilometres (71 mi) on the Sabari River side. Thus, back water spreads into parts of Chhattisgarh and Odisha States. Polavaram Hydroelectric Project (HEP) and National Waterway 4 are under construction on left side of the river. It is located 40 kilometres (25 mi) upstream of Sir Arthur Cotton Barrage in Rajamahendravaram City and 25 kilometres (16 mi) from Rajahmundry Airport . In July 1941, the first conceptual proposal for the project was mooted by the Madras Presidency .

Key facts

ItemDetail
StatusUnder construction
Built byGovernment of Andhra Pradesh
Length3,722 m (3.722 km)
Completion2029 July (Expected)
LocationPolavaram , Eluru district , Andhra Pradesh
CostThe project, when it was conceived in 1946–47, was estimated to cost Rs 129 crore.

Cost and funding

Source: Wikipedia article on the project. Wikipedia is written by volunteers and cites official and news sources; check the linked page and the executing agency for the latest figures.

Other major projects